Wednesday, 20 February 2013

Week 3 (21 January - 25 January 2013)


·         Installing local area network (LAN) at R108. LAN is installed to facilitate and expedite the work to update the attendant in the SAP system.
·         Service/check equipment in each computer lab in block P and block R. this work is to create a report for lost or Damage equipment.
·         Splitter assembly in each computer lab. Splitter is connected to the main computer. Splitter is used to duplicate display on monitor and projector at the same time. 
·         Do disc clean up and disk defragment. Disk clean up was to remove all unnecessary files in the computer such as Temporary internet file. Disk defragment was to rearrange files that neither are nor managed in the Computer.
Troubleshooting internet connection at lab R105B. In this Lab it has 20 PC. We were checking all PC in this lab and found Three PC was not got an internet connection. We have do a troubleshooting and this computer get an internet Connection. 
·         Class maintenance at block P and Block R, checking their network and computer are running as well.