·
Make maintenance at all labs to trace or
check all computers get an internet connection or not. If a lab does not get an
internet connection we must tell to staff. After we check all labs get a
internet connection.
·
Repair computer at R108. Change hard disk
and RAM.
·
Format computer, make a partition, and run
format. After format, we check old hard disk if it can be used for another
computer. If it can’t be use anymore, we must dispose the hard disk.
·
Change a spitter at P112 because that spitter
is damage and it can’t be used. We change a new spiter and the will continue.
·
Check computer at R101 because the computer
not On When we switch on. After we check, power supply of this computer was
broken. We tell this problem to En. Azhar and he will report this problem to
Sapura because this computer is still under contract with this Company.
·
we was assigned to check all computer in
all labs at Block P, Q, R. in this three
block we have 21 labs and We have around
400 pc. We was assigned to check all pc if it was not running we must take a
note and report to En. Wirzuan. This work takes 2 days to finish.
En.Azhar invites all practical
students to server room. At Room we showed all equipment in sever room, how It
functioning and all new technology at TMTC server.
No comments:
Post a Comment